Overview
The EngyBrick multi circuit power monitoring solution is an innovative power monitoring solution that has revolutionized power metering. Based on the concept of modular design, the solution introduces a design idea based on voltage centralized measurement and load loop current separated measurement. It divides the functions of voltage, current collection and display access into individual modules, which greatly increases the flexibility of the system and reduces the cost. Additionally, this distributed metering system also has the advantages of simple installation, flexible deployment and easy accessibility.
Applications
Office Application
Distribution Board Retrofitting Application
01
Flexibility
02
Innovation
03
Implement
04
Monitoring parameter
05
Data accessing
06
UL Certified
Basic System Connection
AC Power System
DC Power System
Energy and power measurement |
|
Active energy and active power accuracy |
Individual module: class 0.2, solid core CTs: class 0.5, split core CTs: class 1 |
Reactive energy accuracy |
Class 2 |
Power factor measurement |
|
Accuracy |
Solid core CTs: class 0.5, split core CTs: class 1 |
Voltage measurement of EngyBrick EBU 10 |
|
Measuring range |
48-480VAC(ph/N) |
Frequency |
45-65Hz |
Frequency accuracy |
±0.02Hz |
Monitoring Type |
1P2W/3P3W/3P4W |
Voltage measurement accuracy |
Class 0.2 |
Power consumption |
0.4W to 0.5W |
Connection |
Removable screw terminal block, 4-core, 0.2-2.5mm² cable |
Current measurement of EngyBrick EBI10 |
|
Number of accesses |
3 |
Related transformer |
EBT20 |
Current measurement accuracy |
Individual module: class 0.2, solid core CTs, split core CTs: class 0.5, |
Connection |
RJ12 interface, 6-core custom cable |
Power consumption |
0.4W to 0.5W |
Q & A
1. What type of CTs do you recommend using?
EngyBrick can be connected to three different types of CTs: solid-core, split-core, and flexible. You can choose the appropriate transformer based on the project environment and rated current. The split-core CTs can ensure uninterrupted power during the project construction process.
2. Is the installation and debugging process complicated?
The modules are designed with a rail-type installation and do not require screws for installation. The module connections are made through wired connections, making the wiring process simple and easy. The current modules can automatically recognize and connect to CTs (CTs) for automatic network configuration. This feature simplifies the entire installation and debugging process, saving time and effort compared to conventional monitoring instruments that require manual configuration.
3. Can it be used for single-phase loads?
The current modules can measure single-phase, two-phase, and three-phase loads simultaneously.
4. Which scenarios is it suitable for?
It is suitable for scenarios with numerous measurement points and energy monitoring requirements including factories, buildings, photovoltaic power generation, microgrids, and infrastructure.